I have a steel joist floor that I did not design but discovered was underdesigned while analyzing for additional loads. 14k3 spanning 27.5' at 2' c/c. 4-1/2 slab on 1/2 deck. First Floor Retail Load. The entire floor needs to be reinforced.
It is a strip mall so adding joists/beams or reinforcing each joist would be extremely difficult and expensive.
I am proposing adding a vertical strut at midspan of the joists and a new dropped girder to cut the span in half, along with new columns and footings. I realize that the bearing/strut needs to be designed and the entire joist needs to be analyzed for stress reversal issues and each member checked.
Does anybody have any experience on this type of project? Any better ideas? Any thought on my proposed plan?
It is a strip mall so adding joists/beams or reinforcing each joist would be extremely difficult and expensive.
I am proposing adding a vertical strut at midspan of the joists and a new dropped girder to cut the span in half, along with new columns and footings. I realize that the bearing/strut needs to be designed and the entire joist needs to be analyzed for stress reversal issues and each member checked.
Does anybody have any experience on this type of project? Any better ideas? Any thought on my proposed plan?