rittz
Structural
- Dec 30, 2007
- 200
I have designed a pressure treated wood foundation for a house for a client. He now wants to use the drawings to build 20 more houses using the same plans. My fee was $500 for the initial structural drawings. The houses are all to be built in the same subdivision.What do you think would be a reasonable fee for each of the projects.