We recently did crude pullout tests for some #6 rebar driven with an air jack into some soil for a temporary excavation's shotcreted slope for OSHA safety. These were like cheap soil nails (no grout) and worked by only friction.
As I recall, the worst number we got was like 1,500 lbs (actual, no safety factor) into some loose fill placed in an old arroyo with 16' or so embed. The tension values were much higher in the native soil (glacial till, I think) but it had so many cobbles that getting a rebar in with an air hammer was problematic.