B16A2
Structural
- Feb 24, 2008
- 186
Is there any possible way to support heavy (100kip reactions) rail cranes, by any means other than dedicated columns located directly under the rail beams? I'm well aware of weld fracture issues, and many manuals say not to bracket above 50kip loads. Just wondering if anyone has overcome this as I have a client wanting to use overlapping high/low rails.