we are intending to repare an API 650 storage tank.
The old tank bottom is leaking and the owner wants to add a second new bottom located say 150 mm from the old one.
The old bottom will be lined , a concrete or sand will fill in the space between the 2 bottoms.
we will add also means at this location to drain or check if they are leakages ...
My questions are:
1/- Does the new annualr ring needs to have the same thickneess as the old bottom ? or could it be thinner ??
( even if the old annular ring is in anot corrode and rests correctly on the ground)
2/-Does the new annualr ring has to protrude also from the lower shell and be about 2" from the edge ?
According to API it is so..and it has has to be welded on both sides (inside and outside of the shell )
3/- Can we not not weld this new annular ring only at the inside of the tank by providing fillet welds on top and botom of this ring
Thanks for your advices
The old tank bottom is leaking and the owner wants to add a second new bottom located say 150 mm from the old one.
The old bottom will be lined , a concrete or sand will fill in the space between the 2 bottoms.
we will add also means at this location to drain or check if they are leakages ...
My questions are:
1/- Does the new annualr ring needs to have the same thickneess as the old bottom ? or could it be thinner ??
( even if the old annular ring is in anot corrode and rests correctly on the ground)
2/-Does the new annualr ring has to protrude also from the lower shell and be about 2" from the edge ?
According to API it is so..and it has has to be welded on both sides (inside and outside of the shell )
3/- Can we not not weld this new annular ring only at the inside of the tank by providing fillet welds on top and botom of this ring
Thanks for your advices