fazel1
Industrial
- May 7, 2005
- 69
It is stated in ASME sec VIII that it is mandatory to attach thermocouple to the pressure part or vessels when PWHT, if they are more than one part or vessel. In secI nothing is found about this matter. we want to PWHT the drums base on secI and vessels base on secVIII, in a calibrated furnace. Is it realy mandatory to attach the thermocouple to these parts body, if we decide to PWHT them one by one?