I am a site engineer at Solétanche Bachy currently involved with the preparation of a project where 30x30cm square 10 m long precast concrete piles are to be installed in sandy, silty soil.
Soil Layer:
-2m Grey silty sandy gravel LANDFILL
-3m Brown sandy SILT
-5,7m Brown, stiff, limy fat CLAY
-6,3m Brown SILT
-8,2m Yellow, silty SAND with gravel
-9,7m Brown, limy, silty SAND with gravel
-10m Grey, sandy SILT
I would like to now what production rate shall I consider. What is the average installation speed when this technique is being used. Also could you have any recommendation where I can find more info on production rates and prices of driven piles.
Thanks in advance
Bal
Soil Layer:
-2m Grey silty sandy gravel LANDFILL
-3m Brown sandy SILT
-5,7m Brown, stiff, limy fat CLAY
-6,3m Brown SILT
-8,2m Yellow, silty SAND with gravel
-9,7m Brown, limy, silty SAND with gravel
-10m Grey, sandy SILT
I would like to now what production rate shall I consider. What is the average installation speed when this technique is being used. Also could you have any recommendation where I can find more info on production rates and prices of driven piles.
Thanks in advance
Bal