Dear All.
Im sorry for this kind of Q.
Problem is vacation at the lot of Xfr mnf.
Im locking for some cost evaluation, for me enough also numbers like X, 2/3X, etc.
We have two options for some industrial power plant:
1. One Xfr 60/85MVA ONAN/ONAF with OLTC Y/D 170/11.5kV Uk=17-18% ( for this, I have values , 1500000 USD up to 200000USD)
2. Two Xfr 14MVA 11.5/22kV with OLTC Uk= 14-16%.( for this, about 500000 USD)
Second option:
two Xfr 30/45MVA ONAN/ONAF with OLTC Y/D/D or Y/Y/D 170/22/11.5kV Uk=17-18%. ( for this from 900000 up to 1700000 USD).
Values not seems for me on this moment, so much difference.
Thanks in advance.
Best Regards.
Slava
Im sorry for this kind of Q.
Problem is vacation at the lot of Xfr mnf.
Im locking for some cost evaluation, for me enough also numbers like X, 2/3X, etc.
We have two options for some industrial power plant:
1. One Xfr 60/85MVA ONAN/ONAF with OLTC Y/D 170/11.5kV Uk=17-18% ( for this, I have values , 1500000 USD up to 200000USD)
2. Two Xfr 14MVA 11.5/22kV with OLTC Uk= 14-16%.( for this, about 500000 USD)
Second option:
two Xfr 30/45MVA ONAN/ONAF with OLTC Y/D/D or Y/Y/D 170/22/11.5kV Uk=17-18%. ( for this from 900000 up to 1700000 USD).
Values not seems for me on this moment, so much difference.
Thanks in advance.