Weldinspect
Mechanical
- Feb 13, 2010
- 204
In our project wich we are about to finish in a tank farm, the design has the LPG line connected to the PLEM at the sea, although we have news that there was once an accident with a hose exploded undeer the boat. How does API order to design, at the sea or at the pier?