Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations MintJulep on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Piping Arrangement of Plate & Frame for Water Side Economizer

Status
Not open for further replies.

TSMBK06

Mechanical
Joined
Jul 22, 2009
Messages
1
Location
US
I am struggling with whether to pipe a plate and frame (150 ton) in series or parallel with two 400 ton chillers for water-side (w-s) economizer cycle. The questions is approach off of the tower and supply water temperature to be supplied during w-s economizer operations. The conditions are arid climate with average high's of 85-90F in the summer with only a three month mechanical cooling load. The base load the remainder of the year is 150 ton or less. The facility is a hospital with base load required 24/7.

Anyone with experience in this application?
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top