Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations MintJulep on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Pipeline heating before backfilling 1

Status
Not open for further replies.

FilippoT

Mechanical
Joined
Oct 13, 2013
Messages
34
Location
IT
I need to install thick pipeline in very cold environment (-30C). Longitudinal stress due to thermal expansion (working temperature is 80 degree) is making the overall stress analysis non passing. Therefore we ere thinking to heat the pipeline after laying and before backfilling to reduce the thermal expansion in restrained condition and decrease the longitudinal stress.
Did anybody experience something like this?
 
It is pretty standard stuff in the Canadian bitumen fields where they use hot water flow over a period of time. It has also been used on trace heated pipework to pre extend the pipe by using the heating system before final closure and backfilling.

Remember - More details = better answers
Also: If you get a response it's polite to respond to it.
 
I think you need expansion loops to allow movement as the metal temperature changes.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top