- Nov 23, 2006
- 37
The problem I have is pile foundations for a bridge. The bridge has to span over a 12m wide moat and the slopes/banks on both sides are 8m height at 35 degrees. In addition, the site constraint includes that the construction of piles must not stabilize or loosen the soil slope.
Could any geotech man give me some clues (e.g. Temp works on slope for the construction of piles, method of driving/boring)?
Thanks