I have a question about secant bored pile construction:
The secant piles (of 10-15m long) are supposed to be constructed in a layer of rock which is porous and low compressive strength. Another constraint is the water table is very high.
Does anybody know there is any method of keeping the borehole dry during concreting if bentonite is not allowed to use?