mutimuti
Electrical
- Jul 2, 2006
- 22
Can anyone tell me the industry standard for protecting radial networks. Some publications for example base the "pick up" on a fraction of minimum fault current, typically 1/3 and the time dial settings based on maximum fault current. Still others use peak load current for pick up and fault currents for time dial settings. I really want to know the preferred method and the reasons for it.