This is really annoying.

I setup a scene, usually an assembly containing another assembly, I assign all my materials, and tweak them. I have the option checked for store photoworks data in model, I setup my render perfectly, and schedule it.

When I schedule the render, it does a sort of pack and go of the current assembly and stores it in a temp directory. When I open that assembly, randomly, half of my objects will have unassigned materials.

What is the deal, how can I make sure my materials are being stored properly in my model?
 