calgeo
Geotechnical
- Aug 14, 2001
- 9
Does a Phase II ESA only include testing of soil, groundwater, and soil gas? If there is a structure at the site which may have lead paint and/or asbestos tiles, do these need to be tested as part of the Phase II? It was not clear from reading the ASTM.