ahmedchn
Petroleum
- Jun 20, 2010
- 4
my question is that if oil industry has to perforate a well (bullet perforating or jet perforating) so does the perforating gun passes form the tubing? the size of the tubing industry has maximum 4 inches so does it mean that perforating gun has the smaller diameter ? and after the perforation is done so doesnt the production starts as soon as we perforate ? and if production starts so how do we retrieve a gun?