onefjef
Agricultural
- Jul 14, 2006
- 119
When linking variables between peer parts in an assembly do you have to create a holding variable for the "linked from" part in the "linked to" part first and then use this to drive another variable? Or can you past the link into the "linked to" parts formula cell and edit the formula?
Example: Post height of part A is 2" more that height of part B.
Example: Post height of part A is 2" more that height of part B.