Hi Everyone!
I have a design which calls for 18" dia drilled piers of fc'=2500psi with a 4" slump, 1 1/2 aggragate, and a .45 wc ratio. The contractor wants to use a "7 sack" pea gravel mix design for workability. It has been a while since I've taken my mix design class (I'm 55)but I seem to remember that a 3/8" aggragate will have more surface area and thus strenght, cracking and shrinage could be a problem. Any one familiar with this application?
Thanks for your help ... and Blessings,
David
I have a design which calls for 18" dia drilled piers of fc'=2500psi with a 4" slump, 1 1/2 aggragate, and a .45 wc ratio. The contractor wants to use a "7 sack" pea gravel mix design for workability. It has been a while since I've taken my mix design class (I'm 55)but I seem to remember that a 3/8" aggragate will have more surface area and thus strenght, cracking and shrinage could be a problem. Any one familiar with this application?