sheetmetalman
Mechanical
- Jan 9, 2003
- 11
I have a large number of sheet metal parts and assemblies that I want to begin to check into the Vault, unfortunately all the pem nuts and hardware from tool box was inserted using configurations from tool box, not copied parts. Is their a way to redirect the file references from the _pmi files to copied parts? Dose anyone know the file structure well enough to write a program to do this?