gramy13
Structural
- Nov 15, 2006
- 15
We've designed a 10-story steel framed office building over a 2-story steel framed partially open garage(the garage entries/exists are open, as well as some metal screened openings for airflow). The steel beams and columns will be spray fireproofed. The garage slabs are hollow core plank. Since it is a partially open garage, subject to humidity and moisture (not direct rain), should the steel also be galvanized or shop primed before the spray fireproofing is applied, or is the spray fireproofing applied to the bare steel enough protection? We've read that the spray fireproofing may not adhere if the steel is galvanized or painted. Thanks for you feedback!