I have a modular structure that is 14' high that will be lifted regularly. It will have lifting lugs at the top. Maintenance requested a permanent ladder and platform at the top for rigging purposes only. Instead of them bringing extended ladder every time rhey need to lift this structure.
If thia was a platform for operation I'd definitely put handrail and ladder cage. Rigging guys said they don't need it.
I'm confused about OSHA requirement in this case. I will probably talk to whoeever does our scaffolding for guidance.
If thia was a platform for operation I'd definitely put handrail and ladder cage. Rigging guys said they don't need it.