Orange Peel reducer fabrication 1

Status
Not open for further replies.

gasoperations

Mechanical
Nov 23, 2008
59
Due to non avilability we have to fabricate a 10"x12" reducer from schedule 40, A53 pipe.

Will it be acceptable as per B31.3 if the sample is proof tested as per 304.7.2

Any help will be appriciated

G.OPS

 
Replies continue below

Recommended for you

Thanks for reply

PatrickR: This is a North Africa Installation. When I say unavailability I mean available in Warehouse store

vezeos: Is CFR 49 that the link refers, necessarily means compliance with B31.3

GOps
 