Nov 27, 2009 #1 sykimm Coastal Joined Nov 30, 2003 Messages 35 Location KR I'm now designing marine pipeway trestles, supported by piles. Is there anybody to give me some idea to reduce number of piles and/or structures? Normal design shows 4 nos. of batter piles per one bent. Thanks in advance.