I2P
Chemical
- Jan 20, 2003
- 38
Friends,
We have a glycol(TEG) based contactor and we also have regeneration packages for the same.I have been reading some articles on the net on various aspects of TEG systems.In one such article I read something interesting.The methane loss due to over circulation of TEG.It was good.I would like to know from others who have such systems, whether there is an outlined approach for total optimisation of TEG regeneration systems.Things like stripping gas optimisation,reboiler optimisation, etc. I would like to know what all other areas are available for optimisation.Thanks in advance
We have a glycol(TEG) based contactor and we also have regeneration packages for the same.I have been reading some articles on the net on various aspects of TEG systems.In one such article I read something interesting.The methane loss due to over circulation of TEG.It was good.I would like to know from others who have such systems, whether there is an outlined approach for total optimisation of TEG regeneration systems.Things like stripping gas optimisation,reboiler optimisation, etc. I would like to know what all other areas are available for optimisation.Thanks in advance