Does anyone know what a rough estimate or specific information dealing with the numbers of electrical instrumentation involved with an offshore petroleum production platform.
I know that there is over 25,000 on the Hibernia platform.
I am looking for the rough number and then I can more easily find how much weight all the wired instruments and cable total.
Thanks,
Jeremy