Hi to all,
In my company we are looking for information about the maintenance of steam tracing.
Normally new projects are estimated by calculating bulk materials.
But here in maintenance we repair, lets say 10 20 meters of tracing. For that purpose I am looking for a time norm to install 1 meter of steam tracing.
So I am speaking of an average norm with all the ingredients in it. Like: handling trace pipe, welding, bandage, bending.
Can anyone help me?
Thanks in advantage.
Raymond Hagedoorn
Cost Engineer Maintenance
Nerefco the Netherlands
In my company we are looking for information about the maintenance of steam tracing.
Normally new projects are estimated by calculating bulk materials.
But here in maintenance we repair, lets say 10 20 meters of tracing. For that purpose I am looking for a time norm to install 1 meter of steam tracing.
So I am speaking of an average norm with all the ingredients in it. Like: handling trace pipe, welding, bandage, bending.
Can anyone help me?
Thanks in advantage.
Raymond Hagedoorn
Cost Engineer Maintenance
Nerefco the Netherlands