70 story residential building, water pumping from basement to 31st floor then pumped to 60th floor. The water tank placed on 31st floor and 60th floor. a VFD booster pump maintains the pressure above the 60th floors. The issues are the water leakage broadly mainly on joints. this is 10-year-old building. the leakage happening on before the branch PRV, the PRV has not seen on main pipe. Only installed on branch pipes. The pipe copper with code of BS-2871-table-X. my question, is that design mistake without installing PRV on main pipe. 31st floor to basement around 384 feet. Then pressure will be exerted 384/2.31=166 psig (26 bar). Is it design error??
thanks
thanks