Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations MintJulep on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Nitrogen purge of tank calculation required

Status
Not open for further replies.

v8landy

Chemical
Joined
Jan 3, 2008
Messages
81
Location
GB
Hi

I need guidance in the calculation required to calculate flow/pressure or Nitrogen fill a tank (5m^3) with Nitrogen.

The tank/Nitrogen is dual purpose
1 it is the blow of tank should the RD go
2 it (the Nitrogen) is used to replace the vacumm of another vessel.

This opperation is preformed every 5 -8 hours, so quite enought time for a steady steam of nitrogen to fill back tank again.

PS tank is open vented to atms due to it as stated ahaing dual purpose of RD dump tank

Is it just as simple as to say tank is 5m^3 = 177 ft^3

therfore if I wanted the tank purged and ready in 2 hours (4 hours between opperations)

(177 ft^3 / 2hrs)60 = 1.48 CFM N2 purge rate (cubic feet per minute) ????????
have used an equation that works out number of purges, and from this it equated to 3.5 to ensure full purge.

From this I would then assume by tank volume to be 3.5 time greater than actual i.e. 615.96 ft^3

i.e (619.5/2hr)/60 mins = 5.12 CFM

???????????
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top