If its piping then probably B 31.3 or B 31.1 if its in a power plant.
Flanges feasible - Yes, but not common unless you have issues with welding in a particular location. Basically one weld instead of two and no cost for two flanges and bolts.
Remember - More details = better answers
Also: If you get a response it's polite to respond to it.