calculor1
Structural
- Sep 16, 2007
- 52
Have a situation where were modifiying an industrial building. The existing foundation consists of very large pile caps supported by timber piles, as can be seen in the attached sketch. Unfortunately my new columns also supported on piles are approximately 20 to 36" away from the edge of these large pile caps. I am proposing to cut a seat in the existing pile and then cast my new pilecap. Does this seem like a reasonable solution or does anybody have another solution?