blanchardMSU
Civil/Environmental
- Feb 8, 2011
- 2
I am currently working on a design for a super structure replacement of a 27ft single span bridge. At this point the CIP reinforced concrete abutments are in great shape but the 65 year old steel beams are shot. We are considering cutting the top 18 to 24 inches off the abutments and replacing the tops of the abutments and the super structure with a PCC three sided box. This will allow for partial with construction and a overall shorter delay to my residents. Any recommendations or experiences with this type of restoration would be appreciated. Scour is not a factor in this case.