Trebormech
Mechanical
- Jun 13, 2016
- 14
Is there ever a case where sufficient NDE of boiler external piping can be done in lieu of a hydrostatic test?
Case in point: Installing a new steam header in a multiple boiler facility where isolation for hydrostatic test would be difficult, if not impossible, due to the number of isolation points involved.
I believe the administrative jurisdiction and technical responsibility for the piping in this case would be ASME B31.1, instead of BPVC section I, because it is a multiple installation common header, according to Fig. PG-58.3.1(a) "Code Jurisdictional Limits for Piping - Drum Type Boilers"
Thank you.
Case in point: Installing a new steam header in a multiple boiler facility where isolation for hydrostatic test would be difficult, if not impossible, due to the number of isolation points involved.
I believe the administrative jurisdiction and technical responsibility for the piping in this case would be ASME B31.1, instead of BPVC section I, because it is a multiple installation common header, according to Fig. PG-58.3.1(a) "Code Jurisdictional Limits for Piping - Drum Type Boilers"
Thank you.