Yes, to the routing procedure as all my references point to that direction. Based on an inflow hydrograph, Manning velocity equation for flow velocities, channel section discharge rates relationships to channel cross sectional areas, time step selections, and miscellaneous parameters, my outflow hydrograph over a dam crest shows a dip in the negative flow rate( vertically plotted)due to the negative value of C(0). I can correct this dip by increasing my time step from 2hrs to 6 hrs however this will affect the shape of my outlfow hydrograph. I am investigating a flooding condition of a low land section along the Housatonic River