Milkboy
Mechanical
- Mar 13, 2002
- 126
I have a Multi Staged Pump
Seal at either end
Both Plan 11 from first stage
The seal at the drive end will
RECIEVE a flow from the Plan 11 pipe
Am I right in saying the flow at the NDE
with be thru the stuffing and OUT via the
Plan 11 pipe as the pressure at the last stage
will be higher than the box fed by the first stage?
This common plan 11 pipe - I guess this
balances the shaft axially aswell ?
TIA
-
Milkboy
Seal at either end
Both Plan 11 from first stage
The seal at the drive end will
RECIEVE a flow from the Plan 11 pipe
Am I right in saying the flow at the NDE
with be thru the stuffing and OUT via the
Plan 11 pipe as the pressure at the last stage
will be higher than the box fed by the first stage?
This common plan 11 pipe - I guess this
balances the shaft axially aswell ?
TIA
-
Milkboy