dcnnng
Civil/Environmental
- Sep 24, 2006
- 40
An existing some 30 years old 7 storey RC framed hotel has been suffering of spalling of concrete caused by corrosion of reinforcement due to sea sand was used as the fine aggregate and carbonation. Previously an Engineer was called to look at the case, he ordered several core tests to be done on structural members including slabs, beam and columns to check the concrete strength and found most of them just below 3,000 psi (20 N/mm2). One of the column on ground floor was cored which would poise a problem though it has been infilled back with some material. In order not to disturb this heavily loaded lowest internal column, it is suggest to carry out some strengthen work to it. Can any expert suggest what are the good methods of strengthening this column and what are the important factors could affect the performance of the strengthened column? Thank you.