Jan 15, 2004 #1 ctopher Mechanical Joined Jan 9, 2003 Messages 17,520 Location USA, CA I can't find a way to move a view from sht 1 to sht 2 of a dwg. I use to cut/copy then paste into sht. I was able to do it in SW03, but now I have SW04 and it won't work. Any suggestions? Thank you
I can't find a way to move a view from sht 1 to sht 2 of a dwg. I use to cut/copy then paste into sht. I was able to do it in SW03, but now I have SW04 and it won't work. Any suggestions? Thank you
Jan 15, 2004 #2 MElam Mechanical Joined Jan 15, 2004 Messages 329 Try dragging the view from one sheet to another in the feature manager Upvote 0 Downvote
Jan 15, 2004 Thread starter #3 ctopher Mechanical Joined Jan 9, 2003 Messages 17,520 Location USA, CA Thanks. I tried that, but I was in sht 2 when I did it. I when to sht 1 then dragged it, now it worked. I remember now. Thanks for you help. Upvote 0 Downvote
Thanks. I tried that, but I was in sht 2 when I did it. I when to sht 1 then dragged it, now it worked. I remember now. Thanks for you help.
Jan 15, 2004 #4 SBaugh Mechanical Joined Mar 6, 2001 Messages 6,691 Location US Cut and paste still works in 04. You have to highlight the view click Cut. Click over to Sht2 Highlight the drawing sheet and click Paste. Regards, Scott Baugh, CSWP http://www.3dvisiontech.comhttp://www.scottjbaugh.com faq731-376 Upvote 0 Downvote
Cut and paste still works in 04. You have to highlight the view click Cut. Click over to Sht2 Highlight the drawing sheet and click Paste. Regards, Scott Baugh, CSWP http://www.3dvisiontech.comhttp://www.scottjbaugh.com faq731-376
Jan 15, 2004 Thread starter #5 ctopher Mechanical Joined Jan 9, 2003 Messages 17,520 Location USA, CA Thanks Scott, but I tried that several different ways and it will not work for me. It worked great with SW2003. Upvote 0 Downvote
Thanks Scott, but I tried that several different ways and it will not work for me. It worked great with SW2003.