Mooring dolphin pile productivity

Status
Not open for further replies.

MEMcGinnis

Civil/Environmental
Joined
Apr 8, 2010
Messages
1
Location
CA
I'm working on construction scheduling for mooring dolphins supported on 1000mm steel piles. They will be driven from barges to a depth of approximately 20m.
What's a typical productivity rate for the pile driving?

Thanks,
M
 
Driven to a depth of 20m into the overburden or does that include the water column? What does the overburden consist of? Are they to be drive with a vibratory hammer or a diesel hammer or other? What is the refusal criteria?

Regards.
 