In PreEng building, main two trusses running along the long side of building. Monorail supported by weld plated on bottom cord of there trusses. Bottom cord of HSS is 3 X2 X.188 and plate is 3/8 X4X6 with two holes for monorail bolt connection.
Does HSS thickness in enough to safe transfer of load and weld that plate to HSS? Monorail rated for 2 ton
Thanks for your time.
Please find attached Photo too.
Thanks,