vato
Structural
- Aug 10, 2007
- 133
I'm designing a stem wall foundation with an interior slab, 50'by70'. I need to restrain the moment frame thrust between piers. It's 25kips. I am proposing to tie the piers together with #5's across and through the slab. Everywhere but at the piers the slab edge has an expansion joint. I'm concerned that I am creating some cracking with some of the slab tied into the foundation and the rest free to expand and contract. I'm using .2% reinforcing in the slab based on temperature. Trying to keep this simple without a separate bond beam under the slab or fancy joints parrallel to the tension bars. thanks.