We're having no luck ramming our ca. 150mm I-section piles into the ground.
As per the Geotech, the ground is very hard with lots of rocks of up to dia. 300mm.
What to do? We've tried pre-drilling with an auger but it seems this method won't achieve the desired results.
What else can we try?
Thanks in advance.
Regards,
Simon
We're having no luck ramming our ca. 150mm I-section piles into the ground.
As per the Geotech, the ground is very hard with lots of rocks of up to dia. 300mm.
What to do? We've tried pre-drilling with an auger but it seems this method won't achieve the desired results.
What else can we try?
Thanks in advance.
Regards,
Simon