Andy25

Mechanical
Oct 4, 2006
4
Does anybody have any experience with "Manufacturing Advanced Programming" (NX4)? This module assists in programming machines that can simultaneously execute multiple channel NC programs.

The problem is, when I run Synchronization Manager I get the message
Synchronization Manager
Failed to calculate machining times.
Error detected during ISV time calculation.

and, sure enough, can't synchronize anything.

I use the machine 2-CHANNEL_LATHE_MM_ the model and postprocessor for which comes with NX4.

I'd appreciate any information that might be helpful. For example, can anybody confirm that this 2-CHANNEL_LATHE_MM_ is actually working?
 