Dec 13, 2019 #1 cad0211 Structural Joined Mar 1, 2018 Messages 19 Location US For LPILE, when you want to ignore say the top 5 ft of soil do you input that into the soil properties or just start the first soil level at a lower depth?
For LPILE, when you want to ignore say the top 5 ft of soil do you input that into the soil properties or just start the first soil level at a lower depth?
Dec 13, 2019 #2 MTNClimber Geotechnical Joined Jul 24, 2018 Messages 661 Location US You already posted four separate threads in another sub forum. Flag this and ask to have it taken down. Upvote 0 Downvote
You already posted four separate threads in another sub forum. Flag this and ask to have it taken down.