SDBRG
Structural
- Sep 14, 2001
- 2
I am a frustrated highway bridge engineer trying to figuure out how to distribute the longitudinal loading from a E80 cooper load from the track through the ballast onto the bridge deck. According to the AREMA manual the load is distributed with respect to the relitive stiffness of the members, which is great but how is it distributed thourgh the ballast to the members? It seems to me the load would reduce as some of it would be absorbed by the ballast. By the way the bridge is 3-span with the members simply supported. Any help on this would be appreciated.