Consider a single story precast building with 60'LH joists. Would there be any issues if the joist is welded at both ends rather then welded @ one and bolted at other? i.e any thermal movement issues?
Personally I think there shouldn't be any problem because the wall panels are precast with regular and more efficient (as opposed to cmu) control joints plus the pre-engineered camber should some how help too, but I am not sure.
FYI-building dim: 60x100.
Personally I think there shouldn't be any problem because the wall panels are precast with regular and more efficient (as opposed to cmu) control joints plus the pre-engineered camber should some how help too, but I am not sure.
FYI-building dim: 60x100.