When getting ready to vent a vacuum chamber (2000 cubic feet), when is the best time and/or pressure to shut down the LN2 flow to the Getter/Scavenger Plates?
Is it better to warm the plates prior to venting?
Is better to introduce some atmosphere into the chamber then shut down LN2 flow to the plates?
We use GN2 for venting.
Any reply is appreciated.
withiam