1.) Do you include wind & seismic loadings in the checking/qualifying of a nozzle when maximum allowable nozzle loads are provided?
2.) Understanding that when performing WRC107 wind and seismic are included. Is there a 1.33 factor applied in this situation?
3.) What is maximum allowable loads are provided for a preheater nozzle, should wind and seismic be used in the evaluation or just the operating combination (Gravity, Thermal, and Pressure)?