In order to understand: we need to stick thin insulation 3 mm of flat steel sheet before profiling
We want to install a system over the profiling line in order to take out paper of adhesive side and to stick on steel sheet.
If you have an idea in an other application that we can use in this case even partly please inform and supplier too
Let us know
We want to install a system over the profiling line in order to take out paper of adhesive side and to stick on steel sheet.
If you have an idea in an other application that we can use in this case even partly please inform and supplier too
Let us know