evdbroek
Chemical
- Jun 16, 2005
- 14
Is it possible to install all shell and tube exchangers vertical. To save space I would like to mount 3 exchangers (1x CEP, 1x AEM, 1x BEV) vertical instead of horizontal.
I noticed that the drain and vent nozzles have a wrong location. But is it mechanically possible? What are other points I have to look after?
I noticed that the drain and vent nozzles have a wrong location. But is it mechanically possible? What are other points I have to look after?