Dissymmetry
Mechanical
- Aug 29, 2003
- 21
Can anyone point me to a specification or requirement for temperature and humidity control of inspection specifically for aluminum parts for the aerospace industry. We are primarily non-commercial which means that FAA requirements may not apply. If there are FAA requirements I would definitely be interesting in seeing them, however. For reference, some of our primary customers are Boeing, Raytheon, government and Nordam.
In the past every where I have worked have always had 68° controlled inspection department and some parts had a 24 hour soak time prior to inspection, but I never saw the driving requirements for this.
In the past every where I have worked have always had 68° controlled inspection department and some parts had a 24 hour soak time prior to inspection, but I never saw the driving requirements for this.